How to maintain the large gear ring of ball mill in daily operation

- Oct 26, 2017 -

1. The 3rd, 5, 8 holes of the half ring with the rubber, with the diameter of 36mm above the wire rope length 10m2 The root, with the 10t chain, the half-toothed ring to maintain the level of the CD across the East ground to be placed on the board, to prevent the contamination of gears.

2. Use the rubber to wrap the 1th, 6 hole of the half tooth circle, with the diameter of more than 36mm wire rope length 10m1 root, wear 1th postman L, 6th hole at the 10t guide chain, the half-toothed ring hanging, into moon shape. The first half teeth hoisting mode with lubrication state and no lubrication condition.

3. The half-toothed ring is hoisted onto the cylinder body and positioned. A 10t guide chain is hung at each end of the half gear ring, and the other ends of the chain are hung on the bolt holes of the simplified flange. Adjust the length of the guide chain to force the chain.

4. Crane coordination, 3 sets of 10t chain top 2 relaxation, while the bottom of a tightening, when necessary with the crane loose hook, move, so that the gear around the simplified downward rotation, until the gear groove up to about 45. To the right bolt hole, bolt fastening, the crane, guide chain pick Hook. A way of rotating the first half teeth of a lubrication state to the bottom of the cylinder.

5. Use the rubber to wrap the other half of the Gear ring 3rd, 5, 8 holes, with a diameter of more than 36mm wire rope length 10m2 root, with 10t chain, to maintain the level of the half ring to the CD across the east of the ground to be placed on the board, to prevent contamination of gears.

6. Use the rubber to wrap this half tooth ring 3rd, 6 holes, with diameter of more than 36mm wire rope length 10m1 root, wear 3rd hole, 6th hole with 10t guide chain, the half gear ring, into moon shape. Hanging to the simplified, guide chain adjustment in place, to the positive bolt hole, the person bolts after fastening, the crane, guide chain pick Hook.